http://keithn.livejournal.com/ ([identity profile] keithn.livejournal.com) wrote in [community profile] davis_square2015-12-10 12:10 pm
Entry tags:

Green Line extension project in increasing jeopardy

There have been two new developments over the last 24 hours, from the Globe:I'm not seeing much of a reason to be optimistic about the GLX project at this point.

Re: dystopia or no? a guessing game!

[identity profile] mindstalk.livejournal.com 2015-12-11 08:47 pm (UTC)(link)
Ironically, the densest city in New England is something of a desert for good transit. No trains except Davis, and the Orange Line running just along the other side (but with no stations *in* Somerville until Assembly opened.) Of the 14 "high value"[1] bus lines, none touch Somerville, while 5 run in Cambridge.

[1] I don't know the T's definition, but it's the same as my list of buses that ostensibly run at least every 20 minutes at all times, not counting post-midnight. That was lowering my standards from 10 minutes, but hey, "world class city" cough cough.