ceo: (Default)
[personal profile] ceo posting in [community profile] davis_square
The reconstruction of Porter Square has begun, with the ripping up of the plaza in front of the T entrance. The Mass. Ave entrances to the Porter Station headhouse have been closed for the duration.

Details of the project are here. Highights include:
  1. Realigning the Somervile Ave/Mass Ave intersection in both directions to be at more of a right angle (opening up a large plaza in front of CVS).
  2. Adding a signaled left turn out of the Porter Square Shopping Center lot onto Mass. Ave southbound.
  3. An exclusive right-turn lane from Mass. Ave northbound to Somerville Ave.
  4. Presumably, redoing the plaza in front of the T entrance, since they're ripping it up. :-)
  5. Relocated bus stops, wider sidewalks, more crosswalks, more trees, all that nifty urban-design spluftiness.
This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

Profile

davis_square: (Default)
The Davis Square Community

February 2026

S M T W T F S
123 4567
891011121314
15161718192021
22232425262728

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Feb. 10th, 2026 03:26 pm
Powered by Dreamwidth Studios