[identity profile] bigrock.livejournal.com posting in [community profile] davis_square
Support your fellow Somervilleians tonight!

Us folks in the Somerville/Medford should all go. Not only is the project needed for Somervile, it is required to be built by 2011 as one of the conditions required to allow the Big Dig to be built.

There will be another important public hearing on the Green Line extension through Somerville on Monday, Feb. 28, at 6:30 p.m. at the Somerville High School Auditorium, 81 Highland Ave. It will be a strain to turn out a large crowd of residents for the third time in four months. But we must do so.

http://www2.townonline.com/somerville/opinion/view.bg?articleid=186793

and some proposed maps :

http://www.somerville-t.com/maps_thumbs.html

Currently, the Green Line ends at Lechmere.

Date: 2005-02-28 08:44 pm (UTC)
From: [identity profile] ert.livejournal.com
Apparently the meeting has been postponed, according to this (http://www.livejournal.com/community/davis_square/249617.html) post.

Profile

davis_square: (Default)
The Davis Square Community

December 2025

S M T W T F S
 123456
789 10111213
1415161718 1920
21222324252627
28293031   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Dec. 24th, 2025 01:53 pm
Powered by Dreamwidth Studios