![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
![[community profile]](https://www.dreamwidth.org/img/silk/identity/community.png)
The entire MBTA system is shutting down all day tomorrow.
I don't understand this decision. During the Blizzard of '78, at least the underground parts of the T were kept open throughout the storm, as was the Longfellow Bridge crossing. If the state wants people not to travel on the roads tomorrow, shouldn't the T be kept open?
I don't understand this decision. During the Blizzard of '78, at least the underground parts of the T were kept open throughout the storm, as was the Longfellow Bridge crossing. If the state wants people not to travel on the roads tomorrow, shouldn't the T be kept open?
no subject
Date: 2015-01-26 08:47 pm (UTC)We actually have a new bus deployed on the 96 bus line. I was told it cost $699,000. Still not as roomy or well-equipped as the bus I rode on my last trip to Ottawa last October.