DCR has posted its presentation of the ped/bike footbridge over the Mystic River:
https://www.mass.gov/service-details/pedestrian-and-bicycle-bridge-over-the-mystic-river-connecting-everett-somerville
This was the presentation of the proposed design they gave last night in Somerville, and will present in Everett tomorrow night. The bridge would extend from the edge of Draw 7 Park to the edge of the Wynn casino, creating connections with a number of bike/ped paths in the area and connecting Everett with the Assembly T stop.
You can submit comments to DCR at:
https://www.mass.gov/forms/dcr-public-comments
Deadline for comments is Wednesday, March 7, 2018.
https://www.mass.gov/service-details/pedestrian-and-bicycle-bridge-over-the-mystic-river-connecting-everett-somerville
This was the presentation of the proposed design they gave last night in Somerville, and will present in Everett tomorrow night. The bridge would extend from the edge of Draw 7 Park to the edge of the Wynn casino, creating connections with a number of bike/ped paths in the area and connecting Everett with the Assembly T stop.
You can submit comments to DCR at:
https://www.mass.gov/forms/dcr-public-comments
Deadline for comments is Wednesday, March 7, 2018.