Porter Square reconstruction
May. 21st, 2004 10:36 pmThe reconstruction of Porter Square has begun, with the ripping up of the plaza in front of the T entrance. The Mass. Ave entrances to the Porter Station headhouse have been closed for the duration.
Details of the project are here. Highights include:
Details of the project are here. Highights include:
- Realigning the Somervile Ave/Mass Ave intersection in both directions to be at more of a right angle (opening up a large plaza in front of CVS).
- Adding a signaled left turn out of the Porter Square Shopping Center lot onto Mass. Ave southbound.
- An exclusive right-turn lane from Mass. Ave northbound to Somerville Ave.
- Presumably, redoing the plaza in front of the T entrance, since they're ripping it up. :-)
- Relocated bus stops, wider sidewalks, more crosswalks, more trees, all that nifty urban-design spluftiness.
no subject
Date: 2004-05-22 06:39 am (UTC)