ceo: (Default)
[personal profile] ceo posting in [community profile] davis_square
The reconstruction of Porter Square has begun, with the ripping up of the plaza in front of the T entrance. The Mass. Ave entrances to the Porter Station headhouse have been closed for the duration.

Details of the project are here. Highights include:
  1. Realigning the Somervile Ave/Mass Ave intersection in both directions to be at more of a right angle (opening up a large plaza in front of CVS).
  2. Adding a signaled left turn out of the Porter Square Shopping Center lot onto Mass. Ave southbound.
  3. An exclusive right-turn lane from Mass. Ave northbound to Somerville Ave.
  4. Presumably, redoing the plaza in front of the T entrance, since they're ripping it up. :-)
  5. Relocated bus stops, wider sidewalks, more crosswalks, more trees, all that nifty urban-design spluftiness.

Profile

davis_square: (Default)
The Davis Square Community

February 2026

S M T W T F S
123 4567
891011121314
15161718192021
22232425262728

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Feb. 10th, 2026 08:02 pm
Powered by Dreamwidth Studios